This is a design build project to demolish the existing Pier Bravo (60’ x 1200’) and design and construct a new ship repair wharf (85’ x 1325’), including the replacement of approximately 600 lineal feet of quay wall (Structure 729), the strengthening the 1000 lineal foot sheet pile wall west of the Dry Dock 6 mole, and the demolition of Pier 8 (60’ x 400’).
Client: U.S. NavyLocation: Naval Base Kitsap-Bremerton, Washington
Completion: January 2012